Product appearance
SD-GW5001 (General Edition)

SD-GW5001 (General Edition)
SD-GW5101 (explosion-proof version)

Indicator Instructions
RUN: move
NET: network
STA: state
(1)The gateway is powered on, the running light is flashing, the state light is always on, waiting for about 3s, and the network light is always on, indicating that the system is running normally;
(2)The gateway is powered on. When the system is running normally, wait for about 40s, the running light is always on, the network light is always on, and the state light is always on, indicating that the gateway enters the configuration mode;
(3)The gateway is powered on, when the system is running normally, wait for about 40s, the running light flashes, the network light flashes, and the state light is always on, indicating that the gateway connection service is normal;
(4)Power on the gateway, when the system is running normally, wait for about 40s, the running light is flashing, the network light is always on, and the state light is always on, indicating that the gateway connection service fails;
Installation Method
SD-GW5001 (General Edition)
Wall-mounted installation:
1.Use the connections to the smart gateway fixed.
2.Wall drilling (punching diameter to the used contact hole distance and expansion bolt diameter match) make connect the installed smart gateway with an expansion bolt fixed with the wall surface.

Trough-type steel-type installation:
-
Use the connections to the smart gateway fixed.
-
Site groove steel hole (hole size to be used connector hole size and hole spacing are the same) use screw the bolt will install the connection parts of the intelligent gateway with the site the trough steel is fixed.

SD-GW5101 (explosion-proof version)
Wall-mounted installation:
1.Wall drilling (punching diameter and the day used holdistance of bracket support and diameter of expansion bolts match) Use expansion bolts to be an intelligent explosion-proof gateway fixed with the wall surface.
2.Attach the antenna support attachment with the expansion bolts good (the length of the expansion bolt is determined according to the site wall thickness) fixed the antenna support and the connections with the bolts.

Welding installation of prefabricated supports:
1.Select the position on the bearing pipe welded on the load-bearing column;
2.Use bolts to connect the intelligent gateway, prefabricated support A,the prefabricated bracket B can be assembled and fixed.

Note: Do not remove the host shell and antenna. Otherwise, it may lead to product failure.