Assembly Method
The wall-assembled Industrial Intelligent Computer is designed for space-constrained applications requiring permanent mounting, such as control cabinets, equipment enclosures, or vertical surfaces. Standard assembly procedure is as follows:
Equipment and Assembly Environment Inspection
Prior to assembly:
- Confirm location provides adequate ventilation clearance (>10cm from walls/obstructions)
- Verify mounting surface structural integrity to withstand 17kg device weight with 5G vibration tolerance
- Maintain ≥5-10cm service clearance for thermal management and maintenance access
Bracket Assembly
- Select Mounting Hardware:
Use VESA 75/100 compliant bracket or proprietary mount kit matching IP54-rated enclosure
- Mark Drilling Coordinates:
Transfer device's M4 mounting hole pattern to surface using template
- Drill and Secure Anchors:
For concrete/steel surfaces:
- Drill Ø6mm holes at markings
- Install M4 expansion anchors with 0.8Nm torque
Device Assembly
- Bracket-to-Surface Assembly:
Secure bracket using M4×12mm stainless steel screws (8.8 grade)
- Device-to-Bracket Assembly:
Engage device with bracket, apply 1.2Nm torque to four corner fasteners
Cable Integration
- Port Connection Sequence:
① Power → ② Ethernet → ③ I/O → ④ Display cables
- Strain Relief Implementation:
- Maintain ≥25mm bend radius on all cables
- Install cable clamps within 100mm of connectors
- Secure bundles with UV-resistant nylon ties (max 150mm spacing)
Post-Assembly Verification:
- Confirm <0.5mm bracket deflection with 20N force
- Validate all connectors achieve IP54 seal rating
- Perform 48h thermal cycle test (-10℃ to 50℃)